Working in France
TSR7 versatility
The TSR7 in the Galerie de la Batarelle in Marseille with our partner BMS. A first concrete spraying was carried out as part of the post-crane safety. Subsequently, a frame was placed to ensure the second spraying phase, i.e., the creation of the concrete cover. This was all thanks to the TSR7's ability to move smoothly through difficult job sites, uneven terrain and high slopes.